River Warrior Volunteers Team Up with River Authority for Stream Restoration Efforts

Written by:

Posted on:

Categories:

Share:

Facebook
Twitter
LinkedIn
Email

Get The Latest:

Join our print or digital newsletter to be informed about the agency’s many projects and other news.

River Warrior volunteers participate in the Medina River Beaver Dam Pilot Program.

Photo credit: Vanessa Velazquez

As part of our commitment to safe, clean, and enjoyable creeks and rivers, the San Antonio River Authority (River Authority) leads stream restoration efforts to improve the physical, chemical, and biological functions of a stream system. Stream restoration is defined as the transformation of a degraded stream corridor to its condition prior to human disturbance. Physical functions that might be improved are reduction in bank erosion and a self-sustaining water and sediment movement that does not require human intervention.

The Beaver Dam Pilot Program is one of the most recent stream restoration efforts led by the River Authority to address the erosion issues at the Medina River Natural Area. Read along to learn more about this pilot program and how you can get involved!

Medina River Beaver Dam Pilot Program

Photo credit: Vanessa Velazquez

The Medina River Natural Area has developed extensive erosion valleys contributing to sedimentation in the Medina River, affecting water quality and aquatic habitats. To address the needs of volunteerism in the community and to pilot test an alternative form of erosion control, the River Authority’s Ecological Engineering Team, in collaboration with the City of San Antonio Parks and Recreation Department, proposed a pilot project involving the River Authority’s River Warrior volunteers. The idea was to build a series of post-assisted log structures in the erosion valleys using local mesquite logs and brush materials and build mini dams to reduce the loss of sediment, allowing nature to rebuild and stabilize the erosion valleys.

This innovative pilot project proposes building 100 of these types of structures and assessing the outcomes. In preparation for the workdays, River Authority staff provided virtual trainings for building these dams for volunteers during the COVID-19 lockdown, and in September 2021, volunteers went on a site visit to look at the prototype dam and to learn firsthand the extent of erosion damage in the area.

The first River Warrior volunteer workday will be held on October 28, 2021, and the two volunteer shifts have already been filled due to the expressed interest and excitement of our dedicated River Warriors. This is the first project of its kind in Texas and, if this project delivers successful outcomes, it has the potential to be employed on lands all over the state!

Join us in our efforts by becoming a River Warrior!

River Warrior volunteers take part in a Medina River Beaver Dam Pilot Program training session

Photo credit: Vanessa Velazquez

The River Warriors are registered River Authority volunteers over the age of 15 who are inspired and energized by our work and want to support the health of the San Antonio River Basin by becoming ambassadors for the San Antonio River.

Visit the Volunteer page of the River Authority’s website to learn more about the volunteer opportunities, including the River Warrior program. After scrolling through the page, you can register to become a River Warrior and receive information and opportunities via email about participating in virtual and in-person trainings as well as volunteer events such as post-storm event litter cleanups, ecosystem restoration plantings and projects, sustainable best management practices, and future Beaver Dam Pilot Program trainings and workdays!

 

Related Articles

Alerts

Stay Weather‑Aware This Weekend

Stay Weather‑Aware This Weekend

Rain is expected across the region this weekend, which may result in high water on roads and temporary closures at low water crossings.

Before heading out, residents are encouraged to check SARiverFlood.org or their local county flood website for real‑time roadway conditions:

These sites provide up‑to‑date information from flood‑monitoring sensors across the region. Real‑time updates are available 24/7 to help you stay informed as conditions change.

Please use caution when traveling and plan routes accordingly.

Restroom Closure Notice – Camino Coahuilteca (Acequia Park Trail)

 

Restroom Closure Notice – Camino Coahuilteca (Acequia Park Trail)

The restrooms at Camino Coahuilteca along the Acequia Park Trail will be temporarily closed on Thursday, April 16 due to parking lot improvements in the area.

We encourage visitors to plan accordingly and utilize nearby facilities during this time.

We appreciate your patience as we complete this work to enhance the park experience.

 

Museum Reach – Oxbow Trail Closure Notice

The Oxbow Trail along the Museum Reach will be temporarily closed beginning Monday, April 13 through May 1 to accommodate project-related work in the area.

For public safety, access to this section of the trail will be restricted during this time. Visitors are encouraged to plan accordingly and use alternate routes.

Wayfinding signage and trail closure notices will be posted at designated locations to help guide trail users around the closure.

We appreciate your patience and understanding as we complete this work to help maintain safe and enjoyable trail conditions.

San Pedro Creek Culture Park

The east bank trail along San Pedro Creek will be temporarily closed between the upper trail at Cameron St. and the lower trail at two access points.

Closure details:

  • The first closure will impact the connector from the upper trail near West Houston St. to the south lower San Pedro Creek trail.
  • Once work at this location is complete and the trail reopens, construction will shift to the second closure area between the upper and lower trails on the opposite side of the green space.

Please follow posted signage and plan alternate routes. We appreciate your patience as this work is completed.

Closed areas around San Pedro Creek Culture Park

The Brackenridge Trail

Trail Lighting Notice – Brackenridge Park Trail

Due to an electrical issue, lighting is currently out along the north portion of the trail, from the Josephine Street inlet to just past Highway 281 within the Brackenridge Park Trail. Our team is actively working to correct the issue and expects repairs to be completed by the end of business tomorrow.

We apologize for any inconvenience this may cause and appreciate your patience as we work to restore lighting. Please use caution when traveling through this area, especially during evening hours.

Trail Closure Alert – Calder Alley, San Pedro Creek

Maintenance work will be done in Calder Alley starting Wednesday, September 18, 2025.

  • Trails will remain open during this work.
  • One bench at a time will be temporarily barricaded while improvements are completed.
  • There may be occasional contractor pickups in the area.

We appreciate your patience as we continue to maintain and improve San Pedro Creek for all to enjoy!

SASPAMCO Paddling Trail

The SASPAMCO paddling trail is open from River Crossing Park to Helton Nature Park.
*Please Note: Paddling Trail from Helton Nature Park to HWY 97 is still closed due to blockages. 

SASPAMCO Paddling Trail Temporarily Closed

Staff have removed two large log jams just downstream of Helton Nature Park, keeping the southern portion of the SASPAMCO Paddling Trail temporarily closed. Staff are working to contact adjacent landowners to support a land-based removal solution.

Goliad Paddling Trail Alert

NOTICE: HWY 59 Landing Site Closed

Due to TxDOT construction on the HWY 59 Bridge, the HWY 59 landing site is closed until further notice. However, the Goliad Paddling Trail remains open, and paddlers can still access the river at the Riverdale, Ferry Street, and Goliad State Park landings.

Please plan accordingly and check back for updates.

River Reach Newsletter and Blog Signup

River Reach is offered as a printed, physical mailing to your residence or business. The Blog is a weekly electronic email with news and updates in order to be more environmentally conscious. Please fill out the form below and indicate your preferred method of delivery.

By submitting this form, you are consenting to receive marketing materials from: San Antonio River Authority, 100 East Guenther St., San Antonio, TX, 78204, US. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.