Board Insights: Michael W. Lackey

Written by:

Posted on:

Categories:

Share:

Facebook
Twitter
LinkedIn
Email

Get The Latest:

Join our print or digital newsletter to be informed about the agency’s many projects and other news.

Interpretive sign at Confluence Park

Last Updated on January 30, 2024

Photo credit: San Antonio River Foundation

This series provides readers the opportunity to learn about the unique insight and experiences of the San Antonio River Authority (River Authority) Board of Directors and their personal connection to the San Antonio River in hopes of inspiring stewardship of area creeks and rivers.

Michael W. Lackey, P.E.

Michael W. Lackey is a graduate of Central Catholic High School and holds a Bachelor of Science from Texas A&M University and an M.B.A from the University of Houston. He is a Principal at Lackey de Carvajal Cx (LCCx), an energy efficiency engineering firm where he verifies that complex building systems perform as intended to achieve energy and water efficiency, reduce CO2 emissions, and improve indoor environmental quality. Mr. Lackey served on the San Antonio Water System board of trustees prior to being elected to the River Authority board and he was also a River Authority-appointed board member of the San Antonio River Foundation. He has been board member since 2009 and his term expires in 2021.

What is your favorite section of the San Antonio River?

Confluence Park has many integrated Green Infrastructure features throughout the grounds.

My favorite section is the area around Confluence Park, just south of Mitchell Street along the Mission Reach of the San Antonio River Walk. Confluence Park is a magical place! I love seeing the diversity of the six eco systems represented and the majesty of the main pavilion’s canopy. And the magic goes beyond the park boundaries! You can also access the San Antonio River and walk along the banks to see firsthand the ecosystem restoration project at work. I enjoy seeing the riffles in the river; they bring the river to life!

Of all the San Antonio River Authority’s current Safe, Clean, and Enjoyable projects and efforts, which do you think is the most impactful or inspiring?

Grand Opening celebration of Elmendorf Lake Park improvements in 2017

Elmendorf Lake Park

As part of our commitment to safe, clean, enjoyable creeks and rivers, the River Authority started a community-based creek restoration effort in 2008 to restore the aquatic and riparian habitats of 11 miles of Alazán, Apache, Martinez, and San Pedro creeks. Following the success of the San Antonio River Improvements Project and San Pedro Creek Culture Park, I’m most excited to see the Westside Creeks Restoration Project continue to move forward. Should the Westside Creeks reach its full potential, it would be a marvelous ecosystem restoration which would open up a major trail system along the whole westside of San Antonio.

Why is it important to be a steward of the San Antonio River Basin and protect area creeks and rivers?

We are blessed with a tremendous natural resource. One of San Antonio’s nicknames is “River City.” The river was essential to the founding of this area 300 years ago. It continues to unite and define us and is a tremendous way for all of us to be more connected to nature. The River Authority maintains more than 500 acres of parks along the San Antonio River’s 240-mile course which provide opportunities for the public to forge meaningful connections with our river.

What is a positive action someone can take to Be River Proud?

River Walk Mission Reach Trash Collected

Trash on the Mission Reach of the San Antonio River Walk after a storm event

All of us can be stewards of the river in our own small ways. We need to be cognizant of the fact that whatever waste or pollution that is carelessly tossed can end up in the river. We must all be mindful of our actions to keep the river clean and enjoyable. From picking up after our pets, to joining the River Authority’s River Warrior program, there are several ways to Show Your River Pride and play an active role in the protection of our creeks and rivers.

Related Articles

Alerts

Mission Reach Area Maintenance

Update (December 2025):
Crews will be moving south of Concepcion Park towards the baseball fields around the Mission Road area. The trail in this section will be closed the morning of Wednesday 12/10 and is expected to reopen the later next week. 

Work will also continue at the current location near mile marker 8.2 for the remainder of the week, where crews will be cleaning the area and hauling off chips and debris. This section of the trail will remain open

When: Beginning October 20, 2025 through Spring 2026
What: Crews will be performing stem-density removal and related vegetation maintenance along sections of the Mission Reach to help manage flood risk and protect surrounding infrastructure. Some trails or segments may be closed temporarily while work is underway.
Why: Removing excess stems that naturally establish along the river helps maintain stormwater conveyance, reduces flood risk, and protects public infrastructure while allowing grassland and native vegetation to recover and thrive.
What to expect:

  • Limited trail closures and intermittent work zones.
  • Crews and equipment working near the riverbanks during daytime hours.
  • Parking areas remain open, but visitors may see signage and temporary barriers.

Questions? Call the San Antonio River Authority at (210) 227-1373 or visit https://www.sariverauthority.org/services/river-health/ecosystems/.

Thank you for your patience while we keep the Mission Reach safe, clean, and enjoyable.

Stem Density work 12.10.2025-12.19.2025

Trail Closure – Mission Reach Area

The Acequia Park trailhead entrance at Probandt Street to the Bexar County Public Works Department building’s trailhead will be closed through December 23rd due to construction. We apologize for the inconvenience.

Trail Closure Alert – Calder Alley, San Pedro Creek

Maintenance work will be done in Calder Alley starting Wednesday, September 18, 2025.

  • Trails will remain open during this work.
  • One bench at a time will be temporarily barricaded while improvements are completed.
  • There may be occasional contractor pickups in the area.

We appreciate your patience as we continue to maintain and improve San Pedro Creek for all to enjoy!

SASPAMCO Paddling Trail

The SASPAMCO paddling trail is open from River Crossing Park to Helton Nature Park.
*Please Note: Paddling Trail from Helton Nature Park to HWY 97 is still closed due to blockages. 

SASPAMCO Paddling Trail Temporarily Closed

Staff have removed two large log jams just downstream of Helton Nature Park, keeping the southern portion of the SASPAMCO Paddling Trail temporarily closed. Staff are working to contact adjacent landowners to support a land-based removal solution.

Goliad Paddling Trail Alert

NOTICE: HWY 59 Landing Site Closed

Due to TxDOT construction on the HWY 59 Bridge, the HWY 59 landing site is closed until further notice. However, the Goliad Paddling Trail remains open, and paddlers can still access the river at the Riverdale, Ferry Street, and Goliad State Park landings.

Please plan accordingly and check back for updates.

River Reach Newsletter and Blog Signup

River Reach is offered as a printed, physical mailing to your residence or business. The Blog is a weekly electronic email with news and updates in order to be more environmentally conscious. Please fill out the form below and indicate your preferred method of delivery.

By submitting this form, you are consenting to receive marketing materials from: San Antonio River Authority, 100 East Guenther St., San Antonio, TX, 78204, US. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.