Utilities Maintenance: Jacks of all Trades

Written by:

Posted on:

Categories:

Share:

Facebook
Twitter
LinkedIn
Email

Get The Latest:

Join our print or digital newsletter to be informed about the agency’s many projects and other news.

Utilities Maintenance Crew with sludge

Last Updated on January 30, 2024

Welcome to our fourth installment of the San Antonio River Authority (River Authority) Utilities series. As we outlined in the introduction to this series, we are sharing what each team within our wastewater utility does, why it is essential, and how it impacts you!

So far, we’ve learned how the San Antonio (River Authority) Operations Team manages the wastewater treatment process, how the Development Team supports new sewer infrastructure, and how the Collections Crew helps maintain the sewer pipelines. In this installment, we will be featuring the Maintenance Team!

What does the Maintenance Team do?

Nearly all maintenance of equipment, grounds, buildings, and wastewater treatment plants (WWTPs) is performed in-house by the Maintenance Team. To cover the maintenance for all areas, the team is split into four smaller groups: field, automotive, WWTP, and facility maintenance. Like many of the Utilities teams covered in this series, the Maintenance Team is on call 24/7. This is necessary, as they support all emergencies that might occur.

The team introduces new microorganisms into the primary treatment via a tanker truck.

Being on this team requires a broad skill set; you could even say the crew is a jack of all trades. Even with four smaller, specialized teams, the entire team strives to be diverse and nimble by cross-training to learn all the maintenance functions. This is done in a couple of different ways, including on-the-job training and working towards required specialized licenses, including Commercial Driver’s License (CDL), Journeyman Electrician License (i.e., electricians apprentices license), Wastewater Treatment License, and Automotive Service Excellence (ASE) licenses.

Maintenance staff servicing a blower

Maintenance Team staff service a blower at the Martinez II Wastewater Treatment Plant in Converse, Texas.

While maintenance can mean fixing something that breaks, it more regularly refers to preventing equipment failure. The team regularly greases and oils components, checks amps and voltages, maintains annual service logs, performs oil changes on vehicles or a gearbox, and much more. For vehicles, the crews maintain everything except the engine. This includes assisting in changing and rotating tires, oil changes, car washes, and even purchasing, registering, or disposing of surplus fleet vehicles across the agency.

Additionally, the Maintenance Team is responsible for a regular cycle of landscaping for all properties under the Utilities purview: WWTPs, administrative buildings, outfalls (where eater is released into the river) and more. They also assist when heavy equipment operation is needed, such as transporting sludge (the byproduct of the wastewater treatment process) to a plant with a sludge press. In special circumstances, wastewater may need to be moved from one WWTP to another in a process known as “pump and haul.”

Students visit wastewater treatment center Students on a River Authority Utilities tour view an outfall.

Phew! How do they keep up with everything, you might ask? The crew uses the same software program as the Collection team: Lucity. Lucity allows the team to stay on a schedule of regular maintenance. This program also allows work orders to be submitted from across the organization. Work orders cover both internal and external requests. For example, an external request can be a callout for a sanitary sewer overflow (SSO), as we learned about in the Collections Crew blog. Examples of internal requests include broken equipment, vehicle maintenance, or even setting up furniture in a room to support a community open house.

Beyond Maintenance

Like our Operations Team and Collections Crew, our Maintenance Team supports the River Authority well beyond routine maintenance emergencies. While the Operations Team is often called when local partners need assistance or would like to seek community assistance funds, they lean on their Maintenance Team colleagues to help install or make repairs for area local entities. The team also participates in career-oriented programs with partners such as the SA WORX Job Shadow program.

All in all, the Maintenance Team supports each team within the Utilities Department and beyond, helping the River Authority and community work towards a safer, cleaner, and more enjoyable San Antonio River. Thank you to this multi-talented team for the vital versatility that keeps the Utilities operations flowing smoothly!

Maintenance Team demonstrating systems to students

The Maintenance Team performs a demonstration for a SA WORX Job Shadow Day.

Coming soon: Look out for the next series, where we will take a deep dive into the work of the Quality Control Team!


Sign up for the River Reach

River Reach is a quarterly, 12-page newsletter that is designed to inform the San Antonio River Authority’s constituents about the agency’s many projects, serve as a communication vehicle for the board of directors and foster a sense of unity and identity among the residents of Bexar, Wilson, Karnes, and Goliad counties.

If you wish to be placed on the mailing list for River Reach, please contact us or complete the form.

Related Articles

Alerts

Park Closure Notice: Trueheart Ranch

Unfortunately, Trueheart Ranch Nature Park (14984 Blue Wing Rd, San Antonio, TX 78221) is closed until further notice due to recent vandalism. We’re working to assess and repair the damage to ensure the park is safe and welcoming for everyone. Thank you for your understanding—updates will be shared as soon as we have them.

Trail Closure: Museum Reach at Pearl

* Trail temporarily closed from 2/3/2025 until 5/16/2025.
* For southbound pedestrian traffic, please exit the river and utilize the Hotel Emma bridge to gain access to the east side river trail. Access to the east side river trail via the elevator or stairs.
* For northbound pedestrian traffic, please exit the river trail at the south bridge to gain access to the east side river trail. Continue north through Pearl towards Hotel Emma. The west & east side river trail accessible via the Hotel Emma bridge.

North Bridge West Landing & Stairs Trail Closure Map

 

Graytown Park Parking Lot Construction Notice 

Construction Timeline: April – October 2024 (estimated)

Improvements are coming to Graytown Park! Parking lot construction will begin in April, and we appreciate your patience as we work to enhance the park for all visitors.

Temporary Closures & Impacts:

  • Upper parking area, pavilion, and restrooms will be CLOSED during construction. Temporary restroom facilities will be provided.
  • Park and river access will be CLOSED Monday–Friday from 8 AM – 5 PM (no access during these hours).

We encourage visitors to plan accordingly and check back for updates as the project progresses. Thank you for your support!

Stay Updated: Follow us on social media for the latest updates.

Goliad Paddling Trail Alert

NOTICE: HWY 59 Landing Site Closed

Due to TxDOT construction on the HWY 59 Bridge, the HWY 59 landing site is closed until further notice. However, the Goliad Paddling Trail remains open, and paddlers can still access the river at the Riverdale, Ferry Street, and Goliad State Park landings.

Please plan accordingly and check back for updates.

SASPAMCO Paddling Trail Temporarily Closed

Staff have removed two large log jams just downstream of Helton Nature Park, keeping the southern portion of the SASPAMCO Paddling Trail temporarily closed. Staff are working to contact adjacent landowners to support a land-based removal solution.

SASPAMCO Paddling Trail

The SASPAMCO paddling trail is open from River Crossing Park to Helton Nature Park.
*Please Note: Paddling Trail from Helton Nature Park to HWY 97 is still closed due to blockages. 

River Reach Newsletter and Blog Signup

River Reach is offered as a printed, physical mailing to your residence or business. The Blog is a weekly electronic email with news and updates in order to be more environmentally conscious. Please fill out the form below and indicate your preferred method of delivery.

By submitting this form, you are consenting to receive marketing materials from: San Antonio River Authority, 100 East Guenther St., San Antonio, TX, 78204, US. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.