USGS Baseline Study of Oil and gas Production Constituent Phase II Project

USGS Baseline Study of Oil and gas Production Constituent Phase II Project

In Karnes and Wilson counties, the number of new oil and gas production wells has increased substantially since completion of the Phase I report. Few surface water and sediment samples have been collected in the area. The USGS continued long-term sampling at a subset of currently-sampled stream sites and new focused sampling of additional stream sites within the Lower San Antonio River (LSAR) Basin where oil and gas production is most active. The study estimates the change in land cover in the central portion of the LSAR Basin due to the conversion of rangeland to well pads sites, new roads, and storage ponds. In addition, streambed-sediment samples will be collected where oil and gas production is most active and was analyzed for polyaromatic hydrocarbon (PAH) and other potential pollutant concentrations.

See the report on possible environmental effects of processes associated with oil and natural-gas production here.

Project Details:

Share:

Facebook
Twitter
LinkedIn
Email

Related Projects

This project will assess the long-term space needs of the River Authority and evaluate various options regarding new building designs for the property located at…
This project will begin design and construction on Mann’s Crossing Park on the Medina River, Hendrick Arnold Park (Straus medina), Trueheart Ranch, and Espada Park.…
The San Antonio River Authority is collaborating with the US Army Corps of Engineers to restore portions of the Westside Creeks, including portions of San…

Alerts

Bridge Installation

Due to bridge installation occurring along the river, there will be a temporary pause in pedestrian traffic. Once the bridge is set down and the rigging removed, the trail will once again be opened. Sorry for the inconvenience.

Acequia Trail Notice

The Acequia trail will have heavy traffic near MROC starting May 22nd until further notice. The SAWS Acequia project will be bringing in crews to work on the lift station site and across the street. There will have flaggers to stop traffic, please use caution. 

SASPAMCO Paddling Trail

The SASPAMCO paddling trail is open from River Crossing Park to Helton Nature Park.
*Please Note: Paddling Trail from Helton Nature Park to HWY 97 is still closed due to blockages. 

River Reach Newsletter and Blog Signup

River Reach is offered as a printed, physical mailing to your residence or business. The Blog is a weekly electronic email with news and updates in order to be more environmentally conscious. Please fill out the form below and indicate your preferred method of delivery.

By submitting this form, you are consenting to receive marketing materials from: San Antonio River Authority, 100 East Guenther St., San Antonio, TX, 78204, US. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.