This project will support the City of Alamo Heights (City) with the design and installation of green stormwater infrastructure (GSI) along Broadway street in conjunction with the City and Texas Department of Transportation efforts to reconfigure the roadway. The length of the project is from Burr Rd. to Austin Highway. River Authority staff will work with the City to implement GSI along the project area to address water quality and stormwater run-off. Major goals of the projects are identified as follows: to capture and slow down storm water and improve quality of run off at San Antonio river headwaters.
Bridge Installation
Due to bridge installation occurring along the river, there will be a temporary pause in pedestrian traffic. Once the bridge is set down and the rigging removed, the trail will once again be opened. Sorry for the inconvenience.