This project will support the City of Alamo Heights (City) with the design and installation of green stormwater infrastructure (GSI) along Broadway street in conjunction with the City and Texas Department of Transportation efforts to reconfigure the roadway. The length of the project is from Burr Rd. to Austin Highway. River Authority staff will work with the City to implement GSI along the project area to address water quality and stormwater run-off. Major goals of the projects are identified as follows: to capture and slow down storm water and improve quality of run off at San Antonio river headwaters.
Trail Closure – San Pedro Creek Culture Park
* Trail temporarily closed from 5/1/2025 until 9/1/2025.
Due to adjacent construction work, the San Pedro Creek Trail on the west side of the creek will be closed from the access
point at W. Nueva Street to Dolorosa Street until further notice. Alternate route with ADA access is on the east side of the creek