The project will convert the existing Westside Creeks Models to a 1D/2D model or a Full 2D model, and analyze models with Future Climate Hydrology based on the 20, 40, and 60 year forecasted time frames. All results and conclusions will be presented to the City of San Antonio, Bexar County, and FEMA stakeholders.
Bridge Installation
Due to bridge installation occurring along the river, there will be a temporary pause in pedestrian traffic. Once the bridge is set down and the rigging removed, the trail will once again be opened. Sorry for the inconvenience.