- Location: 8020 Dave Erwin Dr, San Antonio, TX
- Project Completion Date: June 1, 2020
- Project Features: 1 Bioretention
- N/A
Project Details:
- Total Impervious Area (SF): 23,034
- Total Target Volume (CF): 2,879
- Total Treatment Percentage (% of Target from 1.5" 24-Hour Storm): 68.2
- Total Impervious Area to Treatment (SF): 15,700
- Total Annual Volume Treated (CF): 37,011
- Total Bacteria Load Removed (Colonies/yr): 442 billion
- Total Sediment Load Removed (lb/yr): 91
Share: