- Location: 3014 Rivas Street, San Antonio , TX
- Project Completion Date: November 14, 2018
- Project Features: 7 Bioretentions
- N/A
Project Details:
- Total Impervious Area (SF): 145,579
- Total Target Volume (CF): 18,197
- Total Treatment Percentage (% of Target from 1.5" 24-Hour Storm): 26.3%
- Total Impervious Area to Treatment (SF): 38,312
- Total Annual Volume Treated (CF): 96,899
- Total Bacteria Load Removed (Colonies/yr): 1,159 billion
- Total Sediment Load Removed (lb/yr): 240